376-226A LNER Thompson Composite Corridor BR Crimson & Cream E1230E Class_Class 88 (Previously a build option in
Description
(Previously a build option in the now-discontinued B-17E/F kit ref PKHK01E05)
OUTPUT 15v DC
the longest lived was 82019
Create a timber tunnel portal over a single N scale track
Bring your scene to life with our fantastic range of accessories
376-226A LNER Thompson Composite Corridor BR Crimson & Cream E1230E Class_Class 88 (Previously a build option inEntering traffic just after World War Two, the Thompson coaches were the last mainline corridor coaches to be built by the LNER, and indeed examples continued to be outshopped after Nationalisation in 1948. Utilising steel panelling, a departure from the teak panelling traditionally seen on coaches built by the LNER and its predecessors, the Thompson coaches were sleek and modern in appearance. Whilst much of the fleet would remain in service until
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy























